top of page

The Evolution of Contracting: Embracing the Two-Stage Approach in Construction

The Shift Towards Lower-Risk Contracting


In recent years, the construction industry has witnessed a pivotal shift from traditional single-stage contracting towards a more collaborative and lower-risk two-stage tendering process. This transformation has been driven by a combination of market forces, changing legal requirements, and a heightened awareness of the inherent risks associated with the conventional procurement method.



The Downfall of Single-Stage Contracting


Traditionally, single-stage contracting was the norm, where contractors were presented with a finished design and tasked with shouldering all associated risks. This high-stakes approach often resulted in either significant profits or catastrophic losses, depending on the accuracy of the initial risk assessment. Rob Bradley, a seasoned professional in the construction industry, reminisces about the early days of his career when this method was predominant. He notes the drastic evolution of contracting practices over the past four decades, highlighting the industry's gradual shift towards mitigating risks and fostering collaboration.


The Rise of Two-Stage Tendering


Two-stage tendering emerged as a response to the industry's growing discomfort with the risk-laden single-stage approach. This method involves an initial stage where a contractor is selected to collaborate on the project's design and cost estimation, followed by a second stage where the actual construction work is contracted. The two-stage process not only allows contractors to gain a better understanding of the project scope but also facilitates a more accurate pricing strategy, significantly reducing the risk of disputes and unforeseen costs.


Market Forces and Legal Changes Propel Two-Stage Adoption


The adoption of two-stage tendering has been largely driven by market dynamics and legal reforms. The recent pandemic, material inflation, and an increase in insolvencies have further accelerated this trend. Contractors, now more than ever, are in a position to choose projects that align with their risk appetite, often favouring two-stage tenders over single-stage ones.

Legal advancements, particularly the Building Safety Act 2022, have introduced stringent regulations for high-risk residential buildings, necessitating completed designs to be approved before construction. This legal framework aligns with the two-stage process, emphasizing early engagement and collaborative planning to ensure compliance with building regulations.


The Advantages of Two-Stage Tendering


Two-stage tendering offers numerous benefits, including enhanced collaboration, better risk management, and improved accuracy in cost estimation. It encourages a partnership approach between clients, contractors, and subcontractors, leading to more efficient project delivery. Additionally, the preliminary engagement in the two-stage process helps address design and cost-related challenges early on, reducing the likelihood of delays and cost overruns.


The Future of Contracting: Will Two-Stage Remain Dominant?


As the construction industry continues to evolve, the question arises: will two-stage tendering remain the preferred method, especially against a backdrop of economic uncertainty? While the two-stage approach has its critics, its advantages in terms of risk mitigation, collaborative planning, and legal compliance are undeniable. Moreover, the industry's move towards more sustainable and safety-conscious building practices further supports the continued relevance of two-stage tendering.


The Role of Find A Start in Supporting Two-Stage Contracting


In navigating the complexities of modern construction projects, platforms like Find A Start play a crucial role. By connecting contractors with skilled tradespeople, Find A Start facilitates the assembly of competent teams capable of tackling the unique challenges posed by both stages of the tendering process. Our platform streamlines the process of finding the right talent for specific project needs, enabling contractors to effectively manage risks and deliver projects efficiently.


In conclusion, the shift towards two-stage contracting reflects the construction industry's broader move towards more sustainable, collaborative, and risk-averse practices. As we continue to witness the evolution of contracting methodologies, it's clear that two-stage tendering offers a balanced approach that benefits all parties involved. For more information on how Find A Start can support your next project, visit our website.


bottom of page